Tumgik
Text
How do the flowrider work?
How do the flowrider work?
Flowrider is a structure water park equipment with submersible propeller pumps that inject a three-inch sheet of water over a smooth, composite membrane riding surface.As a result, it produces a stationary wave - or sheet wave - that allows riders to surf its continuously flowing face.
Unlike some might think, the Flowrider is not a wave pool, even though it also creates a man-made, artificial wave.
The majority of surf lagoons use plungers, paddles, or pressure systems to create a moving mass of water that peels across the pool.
Flowrider is constantly pumping thousands of gallons of water, creating a thin wave that allows the rider to surf it - in theory, endlessly.
The seven different models of Flowrider for sale are range in size from 5.48 meters wide (18 feet) and 13.11-meter long (43 feet) to 12.8 meters wide (42 feet), 16.25 meters long (53 feet). They produce between 120 and 720 rides per hour and display a tank capacity that goes from 60,500 liters (16,000 gallons) to 212,500 liters (56,000 gallons).One of the lowest capacity attractions on any Royal Caribbean cruise ship is the surf simulator because it can only handle one passenger at a time.
In normal times, this means just one guest gets to ride, and a long line usually accumulates, especially on sea days.ut with lower capacity, I have observed very short lines for the FlowRider. In fact, most times there is no line at all.
Not only does this mean less of a wait, it means you can get back on the Flowrider quicker and get better at it. Just like your parents always told you, practice makes perfect, and the more times you can hop on your surf board, the quicker you can master surfing.
0 notes
Text
Tumblr media
Water park design Plan process
1.Investment planning: Investigate the market, economy, and peer competition of the project, determine the market positioning of the project, determine the reasonable investment quota of the project and the investment ratio of each functional module.
2.Brand planning: According to investment planning ideas, based on market positioning and attractiveness, determine the project brand strategy and competition strategy. From the perspective of the target consumer group and the future marketing of the project, entertain creative ideas, plan the highlights and selling points of the project, and create differentiation.
3.Design planning: Transition to design implementation according to the ideas of investment planning and brand planning, and carry out comprehensive organization and deepening of design content around the characteristics and differentiation of the splash pad design project. Determine the construction content and functional zoning, select the architectural style, cultural theme, water park equipment and analyze the feasibility, and provide the control technical index requirements or guidance for the subsequent design.when you know the water park equipment, water treatment process, and to make water park design plan now.
4.General plan and design: express the construction content and layout of the project through the general plan design drawing, determine the spatial position relationship of each functional area of ??the project and its connection with the outside, and propose the main landmark building modeling plan and the important node landscape plan, pointing out Design key points and rationally arrange water park equipment.have some Water park design ideas, desgn a water park project is easy, you can check a mini water park project first, study the basic design ideas, and use the water park design software to design your own water park online,and then, you can add some water park theme ideas to the plan,
5.Preliminary design: Deepen the specific design of the partition in accordance with the general plan design drawing, refine the key content of entertainment creativity and core projects, and determine the technical solutions and main parameters.
6. Construction drawing design: compile detailed general amusement park design
drawings, detailed drawings by professions, construction estimates, and express technical requirements such as specific dimensions, materials, and methods of each detail.
0 notes
Text
Water park equipment manufacturers - how to create equipment points
Why water parks can attract so many tourists? Water park equipment is the key point. In the initial stage of investing in water parks, investors should find water park equipment manufacturers to customize the equipment according to the topography of the scenic area and other relevant geography to achieve the desired effect. The following are the three main points for water park equipment manufacturers to build equipment:
1. Security
Some things about water park equipment are special equipment, which can only be put into operation after strict acceptance and testing. Therefore, the manufacturing process should not be sloppy. When planning the water park, safety-centered planning should be implemented in accordance with the requirements of national regulations. Strict supervision.
2. Quality
Quality has always been an issue that investors care about, and it is also related to the safety of tourists. Water park equipment manufacturers strictly control quality, carefully polish the equipment, and leave high-quality equipment. Only such equipment can attract investors and tourists to use it with confidence.
3. experience
When many water park equipment manufacturers make equipment, they blindly imitate plagiarism, resulting in little differentiation of water parks and extremely poor experience. Only by continuous innovation can manufacturers bring excellent experience to tourists.
The precise positioning of the water park equipment can create a more competitive water park and bring an excellent experience of amusement, and the water park created in this way can bring endless joy to tourists.
0 notes
Text
These planning and design points are very important when building a water park The operation of the water amusement park company is a very careful project. As we all know, in the water park, the water play project is one of the most important amusement equipment projects, and most water park equipment will be designed according to the theme of water play. The location of the water park is closely related to traffic problems and meteorological factors.
1. Planning and design of different functional areas
Generally speaking, the flow of people in water amusement parks tends to be concentrated in the middle
of the park. This is because there are more water parks in these areas, and most of them are areas
where young groups and couples like to concentrate on amusement, but there is also a part of the park.
The elderly and women bring their children here. The reason is that the physical strength and energy of
this part of the customers are no match for the younger group. Secondly, this group is not easy to
play, so it is necessary to distinguish the children’s pool from the central amusement area. Leave an
appropriate space.
2. Safe operation planning and design
This is also the top priority of the operation of the water amusement park company. If another accident
occurs, it will affect the normal operation of the park for a long time. Investors need to pay enough
attention to these issues to solve the hidden dangers of safety accidents. , Do an inspection before
opening every day to ensure zero accidents during the operation period.
Especially in the three months of June, July, and August each year, it is the peak period for customers
and accidents are most likely to occur. Therefore, when planning and designing the park, the setting of
rescue safe passages must also be fully considered, and during the operation period, The safe passage
shall not be blocked for any reason, so that in case of emergencies or accidents, customers can be
immediately cleared and rescued.
3. Planning and design of service infrastructure
In fact, the shower room must have a door or a curtain to fully protect the privacy of the customer and
avoid embarrassment. The comfort of the customer's experience is the most important factor in deciding
whether or not to repeat consumption.
4, the planning and design of the gourmet area
The food area is indispensable in the planning and design of the water park, and the number of people
can be distributed in multiple directions. The area needs to be as wide as possible for customers to
buy and eat. The food area is also a rest area. There must be sufficient rest facilities and
conditions. When enough, inflatable recliners can also be equipped, and at the same time, the
management of food waste should be fully considered. Trash cans must be provided at all points and
cleaned up in time to maintain environmental sanitation in the area and ensure that the area is not
polluted to the water in the scenic area.
5. Planning and design of the park’s landmarks
It is necessary to have different markers in the planning and design of the park to command the highest
point of the water park.
0 notes
Text
Accessible playground coming soon to a park near you A grandmother’s love paved the way for a new playground to be built in Lebanon for children of all abilities.
All-inclusive playgrounds enhance physical, social and sensory experiences and are accessible by all.
The new one coming to Memorial Park this fall features a fence with a gate to provide a secure environment and benches for parents, Lebanon Parks and Recreation Director John Messenger said.
A grandmother told Mayor Matthew Gentry that her granddaughter couldn’t access all the playground equipment at the park, he said in a recent newsletter to the city. She asked that the city add equipment compliant with the Americans With Disabilities Act.
“That resident’s concern led to a conversation with our parks department staff,” Gentry said in his newsletter announcing the project. The Lebanon City Council approved and funded the playground, part of a larger park project, in October.
Messenger’s crews removed a defunct concession stand and leveled ground for the new playground after the city’s Independence Day festivities. The new water park playground equipment will cost about $400,000 and will be adjacent to the park’s main playground. A rubberized ground covering will facilitate wheelchair access.
0 notes
Text
Tumblr media
Whether it is a hot spring resort, a SPA spa or a water amusement park, it is a water cultural venue
for leisure, entertainment and vacation with water as the theme. The water park design plan mainly
include the following points:
1. Make the subject clear
Determine the nature and theme style of the planned project, instead of blindly playing with the
concept, because consumers want personal experience and personal experience, so they must highlight the
theme and style.
2. Focus on environmental coordination
Pay attention to the harmony and coordination with the theme environment, the design of the water park
should reflect its own unique insights, integrate the architectural landscape and water landscape
elements, and reflect the theme thought style in the details.
3. Clear functional area division
The functional area setting is carried out step by step, so that visitors will be fully involved and
intoxicated. The project settings should be unique and novel, research and analyze the needs and
feelings of consumer groups, enhance business competitiveness, and make tourists feel the joy of water
in all directions.https://www.jinglewaterpark.com/info/
0 notes
Text
Tumblr media
high speed fiberglass water slide. https://www.jinglewaterpark.com/water-slide/
0 notes
Text
FLOWRIDER FOR SALE
0 notes
Text
Build a hotel water park, This is a hotel's water park project, the hotel covers an big area, they want to plan some land to design and build a water park, used to attract tourists, add some hotel entertainment, So we provide our design such as music fountains pool, water slides, Wave pool, splash pad equipment for kids, Multi-functional swimming pool and some water park equipment
0 notes
Text
design water park project
0 notes
Text
Tumblr media
high quality flowrider, surf simulator machine from china
0 notes
Text
water park design, water park project case
0 notes
Text
Tumblr media
loop water slide
0 notes
Text
design water park project case
https://www.jinglewaterpark.com/info/
0 notes
Text
Tumblr media
big tornado water slide https://www.jinglewaterpark.com/water-slide/
0 notes
Text
0 notes
Text
Tumblr media
high water slide
https://www.jinglewaterpark.com/water-slide/
0 notes